- Assembled onshore at “Neustädter Hafen”, Bremen, the unit could be lifted directly onto the floating construction platform and installed
Accommodation containers
The complex comprises six 20 ft room modules that are used as accommodation containers. In addition to this, a 10 ft sanitary container with shower and toilet and an access staircase with platform were also designed and built.Solutions/equipment:
• Access door with porch and double window with outside blinds
• Electric heater and lighting
• Kitchenette, microwave oven, coffee maker
• 1 table, 4 chairs and double locker
• 1 bunk bed, with mattresses, quilts, pillows and bed linen
Project contractor:
F+Z Baugesellschaft, Hamburg